Laboratory analysis of soil samples showed high values of TPH/DRO showing an initial value of 18,800 and 8,300 ppm and the samples of soil analyzed after treatment with VaporRemed showed a value of 290 ppm and 210 ppm. Both these values are below the stipulated 500 ppm of TPH/DRO. The TPH in the drain water after flushing with the product showed values below the detection levels. The project was recommended for closure as No Further Action was required.